The Penn Yan Aero overhaul process is the
result of over 70 years of experience overhauling
thousands of Lycoming and thousands of
Continental engines installed in all kinds of
airframes flying in all kinds of environments
around the world.
The Penn Yan Aero proprietary overhaul process
is FAA Approved and incorporates dozens of unique
techniques that result in a smoother-running,
longer-lasting engine that helps make flying
safer and lowers operational costs. Fleet
Operators and FBOs repeatedly specify Penn Yan
Aero overhauls because they provide the best
value.
- Logistics management and round-trip shipping within the Contiguous US
- Minimum build spec: Continental's new engine fits and tolerances
- New camshaft and lifters
- New Weight-matched Continental pistons, rings, and wrist pins
- Weight-matched connecting rods
- Crankshaft and rotating assembly, dynamically spin-balanced
- New bearings and bushings
- New seals, bushings, and gaskets
- New Slick ignition harness
- New Slick or overhauled and certified Bendix magneto
- New Champion spark plugs
- New Electrosystems starter
- New Champion oil filter
- New or overhauled and certified oil pump
- Overhauled and certified fuel injection system
- Overhauled and certified turbocharger
- Overhauled and certified waste gate and controller when defined by Continental Aerospace Technologies as an engine part - engine model dependent
- Overhauled and certified exhaust system, less tail pipe when defined by Continental Aerospace Technologies as an engine part - engine model dependent
- New or overhauled and certified fuel pump, if on engine
- New miscellaneous nuts, washers, bushings, and springs
- Current and compliant with all FAA Airworthiness Directives and Manufacturer's Service Bulletins and Letters
- Rigorously tested for a minimum of 90 minutes, through engine's full range of load and RPMs, including a 30 minute full power run and post-run Inspections
- Penn Yan Aero's industry-leading, transferable warranty, supported worldwide
- Diagnostic and technical service through installation and start-up