Labor Allowance Rates

TSIOL-550

Back
Accessories Hours Footnotes
ACCESSORY DRIVE HOUSING 1 Engines that are required to be partially removed from aircraft mount for access - Add 8 hours.
AFTERCOOLER    
AIR CONDITIONER BELT 2  
AIR CONDITIONER COMPRESSOR MOUNT 4  
AIR CONDITIONER SHEAVE 2  
ALTERNATOR OR GENERATOR 2 Front right gear driven alternator - Add 1 hours.
CARBURETOR    
COMPLETE FUEL INJECTION SYSTEM 13  
COMPLETE TOP OVERHAUL 52 If multi probe CHT and/or EGT is installed - Add 3 hours. If TCM factory intercooler is installed - Add 2 hours.
COOLANT PUMP 4  
CRANKSHAFT OIL SEAL 3  
DIVERTER VALVE    
ENGINE CHANGE 55 If multi probe CHT and/or EGT is installed - Add 3 hours. If TCM factory intercooler is installed - Add 2 hours.
ENGINE MOUNT/COOLER BRACKET FORGE    
EXHAUST SYSTEM COMPLETE    
FIRST CYLINDER CHANGE 12 Second or third cylinder on same side - Add 8 hours. Multi probe CHT and/or EGT per cylinder - Add .5 hours per cylinder.
FUEL CONTROL UNIT 4  
FUEL DISCHARGE NOZZLE 0.5  
FUEL PUMP 6  
IGNITION HARNESS COMPLETE 3  
INTERCOOLER 6  
MAGNETO 1.5  
MANIFOLD VALVE 1  
OIL COOLER 12  
OIL PUMP 5 Engines that are required to be partially removed from aircraft mount for access - Add 8 hours.
OIL SUMP 3 Engines that are required to be partially removed from aircraft mount for access - Add 8 hours.
OVERBOOST VALVE 1  
PUSHROD TUBE SEALS PER CYLINDER 1.5  
RADIATOR 12  
RADIATOR FLUSH 5  
ROCKER BOX GASKET PER CYLINDER 0.5  
SCAVENGE PUMP 2  
STARTER 1.5  
STARTER ADAPTER 6 Engines that are required to be partially removed from aircraft mount for access - Add 8 hours.
TACH ADAPTER 1.5  
THROTTLE & CONTROLLER 5  
TURBO CONTROLLER 1.5  
TURBOCHARGER 5  
VALVE ASSEMBLY EXHAUSE BY-PASS    
WASTEGATE 4